Abdulmajid, S A D (1967) Resource forecasting models for private housing projects, Unpublished PhD Thesis, , The University of Manchester.

Adams, C D (1995) Procurement of microtunnelling projects, Unpublished PhD Thesis, , The University of Manchester.

Adul-Hamid, R (1996) Construction duration prediction using neural network methodology, Unpublished PhD Thesis, , The University of Manchester.

Coram, W R (1997) The privatisaton of the property services agency, Unpublished PhD Thesis, , The University of Manchester.

Eldosoky, A I (1987) Dealing with uncertainty in construction projects with particular reference to Egypt, Unpublished PhD Thesis, , The University of Manchester.

Fenn, F P (1999) An aetiology of construction disputes, Unpublished PhD Thesis, , The University of Manchester.

Holden, S L (2021) Land, materials, and construction site: Decommodification through alternative construction, Unpublished PhD Thesis, , The University of Manchester.

Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Luo, J (1998) The transitional construction industry and sino-foreign construction joint ventures in the p.R. Of China, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Luo, J and Gale, A (1998) The transitional construction industry and sino-foreign construction joint ventures in the p. R. Of China, Unpublished PhD Thesis, , The University of Manchester.

Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance, Unpublished PhD Thesis, , The University of Manchester.

Mohamed Sultan, A A B (2019) Decision tools for recycling with a focus on fibre reinforced composites, Unpublished PhD Thesis, , The University of Manchester.

Ng, S-t T (1996) Case-based reasoning decision support for contractor prequalification, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Nosair, I A R (1987) The relevance of computerised modelling techniques to construction management problems and training in Egypt, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

  • Type: Thesis
  • Keywords: project cost; resource allocation; training; Egypt; computer modelling; construction project
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2699922257
  • Abstract:
    The objectives of this thesis are to study the relevance of computerised modelling techniques to the solution of construction management problems in Egypt and to determine a training programme for undergraduate and postgraduate engineers in that country.The main body of work consists of the following studies:-1. Determination of the time/cost relationship for different kinds of actual construction projects using the Project Cost Model (PCM).2. Appraisal of planning techniques.3. Clarification to the effect of resource allocation on the time/cost relationship.4 Discussion of modelling and modelling problems. In this section special attention has been given to the application of P.C.M.5. In the study of the various relationships between time and money in construction projects the following contracts have been used:-a. The 3 KM. length of concrete box culvert between Ameria pumping station and the boundary of Greater CAIRO, which is part of the the CAIRO WASTEWATER PROJECT currently under construction. This is an example of a large linear project.b The Ameria pumping station as a typical example of a major nonlinear project, which is also under construction as part of the same scheme.6. Discussion and comparison the experimented results.7. Consideration of the re levance of computer modelling techniques as an aid to construction management in Egypt8.Definitions of training requirements for engineers training at Egyptian Universities.

Nour, H A (2003) An information approach for enhancing the health and safety file, Unpublished PhD Thesis, , The University of Manchester.

Parvar, J (2003) Neural networks decision support system (decision to bid), Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Peacock, W S (1990) Site investigation procedures and risk analysis, Unpublished PhD Thesis, , The University of Manchester.

Samo, S R (1999) Energy conservation in UK housing and the effect of building regulations, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Sansone, R (2020) Latent matters: Megaprojects and political imaginaries in post-revolution Tunis, Unpublished PhD Thesis, , The University of Manchester.

Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach, Unpublished PhD Thesis, , The University of Manchester.

Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam, Unpublished PhD Thesis, , The University of Manchester.

Suraji, A (2001) Development and validation of a theory of construction accident causation, Unpublished PhD Thesis, , The University of Manchester.

Tipple, C (1993) An analysis of the development of the construction industry since the 18th century, Unpublished PhD Thesis, , The University of Manchester.

Wearne, S H (1969) Organization of large engineering design departments, Unpublished PhD Thesis, , The University of Manchester.

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects, Unpublished PhD Thesis, , The University of Manchester.